Greenwich High Road, London

We took this project from an empty shell to a high spec office complex within the space of thirteen weeks. All perimeter walls were drylined, walls & ceilings plasterboarded as required and interior plasterboard or glazed partitions erected. A heat recovery air conditioning system was also installed throughout. The area now boasts a reception/waiting area, consulting rooms and a play therapy room in a creche style, offices, a kitchen and toilets.

 

Back to top|Contact me